1

High-Efficiency 400 kW Chiller Installation Secures Fifty Thousand Pounds Yearly Energy Savings and 200 Tonnes CO₂ Saving

News Discuss 
Project Summary Newsome has recently delivered the installation and commissioning of a new 400 kW chiller at a major confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation improves cooling reliability while lowering overall energy usage and CO₂ emissions. https://mysocialport.com/story6213511/advanced-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-metric-tonnes-co%E2%82%82-cut

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story